|
|
|
| |
 |
High Pressure
- Installation of CNG Compressor System
- Installation of CNG Dispenser
- Fabrication and Installation of Cascade / Priority Panel / Filtration System
- Testing, commissioning and calibration of equipment
- Design, Laying , connection, modification and testing high pressure lines.
Low Pressure
- Main pipe line, valve, fittings installation and testing.
- Blow down Vassal fabrication and installation.
Cooling System
- Installation of cooling tower
- Installation of heat exchanger
- Fabrication and installation of water lines
Electrical System
|
| |
|
| Copyright © 2011. All Rights Reserved. |
|